Detailed Engineering Survey, Design, Cost estimate and Study Report (DPR) preparation of Lamahi Municipality Water Supply Project (Ward No. 6,7 & 8), Dang;

Client 

Department of Water Supply and Sewerage Management, Federal Water Supply and Sewerage Management Project, Nepalgunj, Banke

Year of Completion - July 2020

Description of Services Provided 

The following services have been provided:

  • Carried out socio economic and demographic survey.
  • Carried out geotechnical investigations, ground water investigation (hydro geological), water sampling etc.
  • Detail survey preparation of design, drawings and cost estimate of distribution and transmission pipeline.
  • Detailed design of water treatment plant
  • Design of WUSC Office Buildings and Watch man Quarter.
  • Preparation of design, drawings and cost estimate of Gender and disable friendly Public Toilets and Fire Hydrants.
  • Economic and Financial analysis of WSS schemes
  • Preparation of Contract Documents, Specification, Bidding Documents etc for the implementation of water supply schemes.
  • The project has 76.61 KM pipe network, 450 Cum. overhead tank, design discharge 61.74 lps, water treatment plant – pressure filter with aeration tower.