Detailed Survey, Design, Cost Estimate and Study Report Preparation of Urlabari Brihat Co-financing Water Supply and Sanitation Project, Morang;

Client 

Project Management Office, Co-finance Water Supply and Sanitation Project, Department of Water Supply and Sewerage Management, Panipokhari, Kathmandu

Year of Completion - May 2022

Description of Services Provided 

The following services have been provided:

  • Carried out socio economic and demographic survey.
  • Carried out geotechnical investigations, ground water investigation (hydro geological), water sampling etc.
  • Detail survey preparation of design, drawings and cost estimate of distribution and transmission pipeline.
  • Detailed design of water treatment plant
  • Design of WUSC Office Buildings and Watch man Quarter.
  • Preparation of design, drawings and cost estimate of Gender and disable friendly Public Toilets and Fire Hydrants.
  • Economic and Financial analysis of WSS schemes
  • Preparation of Contract Documents, Specification, Bidding Documents etc for the implementation of water supply schemes.
  • The project has 206.63 KM Pipe network, 450 Cum overhead reservoir tank, discharge Scheme - I: 50.15 lps, Scheme – II: 57.45 lps, Scheme – III: 61.19 lps, water treatment plant – pressure filter with aeration tower.