Water Supply Projects
Detailed Survey, Design, Cost Estimate and Study Report Preparation of Urlabari Brihat Co-financing Water Supply and Sanitation Project, Morang;
Client
Project Management Office, Co-finance Water Supply and Sanitation Project, Department of Water Supply and Sewerage Management, Panipokhari, Kathmandu
Year of Completion - May 2022
Description of Services Provided
The following services have been provided:
- Carried out socio economic and demographic survey.
- Carried out geotechnical investigations, ground water investigation (hydro geological), water sampling etc.
- Detail survey preparation of design, drawings and cost estimate of distribution and transmission pipeline.
- Detailed design of water treatment plant
- Design of WUSC Office Buildings and Watch man Quarter.
- Preparation of design, drawings and cost estimate of Gender and disable friendly Public Toilets and Fire Hydrants.
- Economic and Financial analysis of WSS schemes
- Preparation of Contract Documents, Specification, Bidding Documents etc for the implementation of water supply schemes.
- The project has 206.63 KM Pipe network, 450 Cum overhead reservoir tank, discharge Scheme - I: 50.15 lps, Scheme – II: 57.45 lps, Scheme – III: 61.19 lps, water treatment plant – pressure filter with aeration tower.