Detailed Engineering Design and Study Report (DPR) of Gauriganj Water Supply Project, Bharatpur Metropolitan City, ward 8, Chitwan;

Client 

Department of Water Supply and Sewerage Management, Federal Water Supply and Sewerage Management Project, Bharatpur, Chitwan

Year of Completion - July 2022

Description of Services Provided 

The following services have been provided:

  • Carried out socio economic and demographic survey.
  • Carried out geotechnical investigations, ground water investigation (hydro geological), water sampling etc.
  • Detail survey preparation of design, drawings and cost estimate of distribution and transmission pipeline.
  • Detailed design of water treatment plant
  • Design of WUSC Office Buildings and Watch man Quarter.
  • Preparation of design, drawings and cost estimate of Gender and disable friendly Public Toilets and Fire Hydrants.
  • Economic and Financial analysis of WSS schemes
  • Preparation of Contract Documents, Specification, Bidding Documents etc for the implementation of water supply schemes.
  • The project has 182.10 KM pipe network, 450 Cum Overhead Reservoir Tank, design discharge 70.00 lps, water treatment plant –chlorination unit.