Menu

Wastewater Management Projects

Detailed Engineering Survey, Design and Preparation of Estimate of Urlabari Bazaar Sewer Construction and Treatment Project, Morang;

Client 

Water Supply and Sanitation Division Office, Biratnagar, Morang

Year of Completion - Ashadh 2075

Description of Services Provided 

  • Carried out socio economic and demographic survey.
  • Carried out geotechnical investigations, ground water investigation (hydro geological), Sewage sampling etc.
  • Detail survey preparation of design, drawings and cost estimate of distribution pipeline.
  • Detailed design of waste water treatment plant,
  • Design of Office Buildings and Watch man Quarter,
  • Economic and Financial analysis,
  • Preparation of Contract Documents, Specification, Bidding Documents etc for the implementation of waste water Management Project and for sewage collection, conveyance, treatment and its disposal.